Our Modern-Resort Home

This is our House blog. It takes you into our journey from the point of hacking to completion. And finally we moving in and enjoying our house.

Saturday, March 10, 2007

Almost Done

The house is almost complete.
All the tiles are up, toilet WCs, Basins, Showers are installed.
Left just the kitchen cabinets, painting and the lightings, and the house should be nearly move in condition.

We are so happy and anticipating on the day when we finally can move in.


More updates of the house.

Master bedroom Bathroom

White WC

Frosted Amber bowl (compliment from our ID)



Master bedroom Bathroom

Rain shower + flexible shower



All the toilet accessories are all in these boxes .


Aircon (Toshiba System 2)

Installed in our Master bedroom and Study room.


Common bathroom

White basin

White toilet (WC)


Common bathroom

Shower set


Our Gate which will greet you upon your arrival


We have choosen to go for all horizontal grilles instead.
This way it makes the house looks wider.. and allow more lights to come through while keeping the place secured.


We have request for Citygas to install Hot Water system
It's gonna be installed here.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home